MVEC "DEBNEVO"

The project envisages the construction of a new MVPP on an existing dam and canal, built at the beginning of the 20th century to divert water to a mill and mills on the property, intended for HPP. For this purpose, a reconstruction of the ditch was carried out, including upgrading and construction of a fish passage, restoring the migratory possibilities of fish in the river. The existing channel was also reconstructed, and pressure pipelines and the building plant of the hydroelectric power station were built., from where the spent water quantities are returned to the river.

Contractor: TOP LTD
Project Manager: Yuzina B.B. Ltd
Responsibilities of Hydrosis Engineering Ltd: Design of parts Hydraulics, Hydrotechnical, Architecture, Constructive , Plumbing, PB, PBZ, Geodesy, Vertical planning, Geology,
Location: with. Named, common. Asenovgrad
Status: Built, in operation

Technical parameters

Gross effort: 9,50m
Built-up water quantity: 8,0m³/s
Ecological water quantity: 450l/s
Total power: 550kW
Turbine type: 2No. Crossflow turbines