MVEC "NAMED"
Derivation HPP is located on the river. Chepelarska, with water intake in the village. Named.
Project Manager: Yuzina B.B. Ltd
Responsibilities of Hydrosis Engineering Ltd: Design of parts Hydraulics, Hydrotechnical, Constructive of HTS, Plumbing, PB, PBZ
Location: with. Named, common. Asenovgrad
Status: Built, in operation
Technical parameters
Gross effort: 23,67m
Built-up water quantity: 5,5m³/s
Total power: 870kW
Turbine type: 1No. Crossflow turbine