"PAVLIKENI" MWEC
Derivation HPP, located on an existing reinforced concrete duiker near the river. Pavlikens, common. Pavlikeni.
Contractor: Rusgaz Ltd
Project Manager: Hydrosis Engineering Ltd
Responsibilities of Hydrosis Engineering Ltd: Design of parts Hydrotechnical, Architecture, Constructive, Plumbing, Electrical engineering, Geodesy, Geology, PBZ
Location: city. Pavlikeni, common. Pavlikeni
Status: Built, in operation
Technical parameters
Gross effort: 33,07m
Built-up water quantity: 2,5m³/s
Total power: 800kW
Turbine type: 1No. Francis turbine